This Sunday, after months of construction, the new Itoigawa Station is going to be (mostly) complete!
The local rail terminal and North Entrance to Itoigawa Station is for the most part complete. A gangi, or Japanese-style roof over a footpath, is still to be built on the walkway in front of the station. This part of the station will be open for use starting December 1st. To the left of the picture is part of the old Itoiagawa Station which had been converted into a small temporary station during the construction process. From December 1st this building will be reconverted back into station offices.
On the other side of Itoigawa Station, work continues on the South Entrance and the platform for the Hokuriku Shinkansen which is scheduled to open in early 2015. Until this construction is complete, only the North Entrance of the station will be usable.
Join us Sunday morning when the gates are opened and the first passengers enter the station! The City of Itoigawa and Japan Rail will be hosting a celebratory event from 10am. Check back here tomorrow for more information!
-Ishikoro